Crerar Library roof update: gravel removal starts June 16

The next phase in the Crerar Library roof replacement project starts June 16th with the removal of the existing gravel on the roof. Work on the east side of the roof is scheduled for June 16th-24 and the west side for June 25-July 3, weather depending. The gravel removal is done via a large vacuum machine that generates a noise similar to an engine; please keep this is mind when settling on an area of study in the library on those dates. Thank you for your cooperation.